研究目的
To analyze the performance of a 12 kWP rooftop grid-connected photovoltaic plant installed under net metering in Delhi, India, focusing on various performance parameters.
研究成果
The annual average energy generated was 1147 kWh/kWp with a performance ratio of 85-93%, the highest among other PV plants in India. The study highlights the effectiveness of rooftop grid-connected PV plants under net metering in urban areas like Delhi.
研究不足
The plant was non-operational for 86 days due to inverter malfunctioning, power cuts, and maintenance work. Energy generation was also affected by shadows from nearby structures and bird droppings on the modules.
1:Experimental Design and Method Selection:
The performance analysis is based on the evaluation of various performance parameters such as monthly average reference, array and final yield of PV plant.
2:Sample Selection and Data Sources:
The analysis uses data from a 12 kWP rooftop grid-connected PV plant installed in Delhi, India.
3:List of Experimental Equipment and Materials:
The plant includes PV modules, an inverter, digital energy meters, a pyranometer, and temperature probes.
4:Experimental Procedures and Operational Workflow:
Data on AC/DC voltage, current, and energy generated by the PV plant, along with solar irradiance and temperature, are recorded at 5-minute intervals.
5:Data Analysis Methods:
Performance parameters are calculated using formulas from the IEC 61724 standard guidelines.
独家科研数据包,助您复现前沿成果,加速创新突破
获取完整内容